SENG 365 Schedule

Author
Affiliation

Neil Ernst

University of Victoria

Published

August 6, 2026

Term: Wednesday, September 9 – Friday, December 4, 2026 (13 weeks). Classes: Tuesday (Day 1) / Wednesday (Day 2) / Friday (Day 3), 50 minutes each. Reading break: November 9–13 — no classes all of Week 10. Holiday: Wednesday, September 30 — no class for the National Day for Truth and Reconciliation.

Topics follow the module structure from the lecture materials, with requirements moved into Week 2 so M1 starts with the right vocabulary. Lab activities mix core skills with project feedback, review, and guidance.

Week Dates Day 1 (Tue) Day 2 (Wed) Day 3 (Fri) Lab Due
1 Sep 9–11 M1 Intro; design before AI; abstraction M2: OO in Java; encapsulation No lab
2 Sep 15–18 Guest lecture: requirements and model problems Guest lecture: domain modelling and user stories No lecture Requirements studio for M1
3 Sep 22–25 M2: Types, classes, visibility M3: Interfaces and polymorphism; design patterns intro Ethics GitLab workflow, issues, and CI M1
4 Sep 29–Oct 2 M3: Class diagrams No class: National Day for Truth and Reconciliation M4: State and state diagrams TA peer review and M1 revision
5 Oct 6–9 M4: Identity vs. equality; Singleton M5: JUnit and Gradle; test qualities M5: Stubs, dependency injection, and coverage JUnit and coverage M2
6 Oct 13–16 M6: Composition; Composite M6: Decorator and Command M6: Sequence diagrams; Law of Demeter TA peer review and M2 design guidance
7 Oct 20–23 M7: Inheritance and subtypes M7: Template method; composition vs. inheritance M7: Code smells and refactoring Practice Lab test: design and refactoring M3 (Cycle 1 boundary)
8 Oct 27–30 Midterm review Midterm Midterm debrief; Cycle 2 AI workflow Cycle 1 retrospective and partner transition Midterm
9 Nov 3–6 Midterm review 2; common design gaps M8: Inversion of control; Observer / MVC AI-assisted requirements critique TA peer review and M4 guidance M4
10 Nov 9–13 Reading Break
11 Nov 17–20 M8: GUI and event handling M8: Visitor pattern M8: Concurrency; threads and sync Docker and local deployment
12 Nov 24–27 M8: Concurrency pitfalls and patterns M9: Functional interfaces and streams M10: AI and design GitLab deployment and M5 review M5
13 Dec 1–4 M10: Deployment M10: Wrap-up Final review TA peer review and M6 deployment checks M6 (final deadline)

Project Milestones

Milestones are self-paced within each cycle (linear order, minimum one week apart), with fixed boundaries at M3 and M6. Target dates below are the recommended cadence.

Milestone Cycle Target Deliverable
M1 1 Fri Sep 25 (Wk 3) Requirements and specification (no AI)
M2 1 Fri Oct 9 (Wk 5) System design (no AI)
M3 1 Fri Oct 23 (Wk 7) Working prototype — fixed; Cycle 1 boundary
M4 2 Fri Nov 6 (Wk 9) Requirements and specification (AI permitted)
M5 2 Fri Nov 27 (Wk 12) System design (AI permitted)
M6 2 Fri Dec 4 (Wk 13) Prototype, testing, and deployment — fixed; final deadline

Partner switch and new model problem occur at the M3 boundary (Week 7).